Résumé
- A unique emphasis on multiple case studies. Part three of the book has eight separate case studies.
- A unique systems perspective including project coding which is essential for project database management.
- Computerized exerciese have all been run on mainframe and a variety of PC Project Management packages. The cases have been processed on PC's, with a number of packages discussed throughout the text.
Computer-Aided Project Management is designed to introduce advanced undergraduate students and practitioners to the field of project or construction management. The text assumes some familiarity with the language of accounting, financing, procurement, scheduling and construction. Computer literacy is a prerequiste. The text will teach how to define a project in a language the customer can understand, and that the project team can use to deliver the project to the customer. The book covers all phases of the project and reinforces concepts through use of case studies.
Contents
- Abbreviations, Acronyms, & Definitions
- Preface
- Acknowlegments
- Project Management As Paradigm
- Part One -- Introduction
- 1 Introduction
- 1.1 What is A Project
- 1.2 Projects as Horror Stories
- 1.3 Project Management as Horror Stories
- 1.4 The Systems of Project Management
- 1.5 Computer Aided Project Management
- 1.6 Computer Tools and Projects
- 1.7 Summary
- References
- Part Two -- Systems of Project Management
- 2 The Project Definition Structure
- 2.0 Introduction
- 2.1 What Is Project Defintion
- 2.2 Management's View of Project Definitions for Scheduling Construction
- 2.3 The Place of Project Definition
- 2.4 The Theory of Project Definition
- 2.5 Airport Project Defintion Structure Example
- 2.6 Research Center Project Definition Structure Example
- 2.7 Summary
- Questions & Exercises
- References
- 3 The Work Breakdown Structure
- 3.1 The Purpose of the Work Breakdown
- 3.2 The Evolution of Work Breakdown Structures
- 3.3 Earlier Work Breakdown Structures
- 3.4 The Performance Measurement Strucutres
- 3.5 The Less Traveled Project Cost Code Road
- 3.6 Characteristics of Work Breakdown Structures
- 3.7 Examples of Work Breakdown Structures
- 3.8 Examples of Activities From Work Breakdown Structures
- 3.9 Summary
- Questions & Exercises
- References
- 4 The Project Functional Organization
- 4.1 The Origins of Project Management
- 4.2 Systems of Project Management and the Matrix Organization
- 4.3 Construction Project Functional Organzations
- 4.4 Not a Project Management Organization
- 4.5 Project Functional Organization as Cost Code
- 4.6 Summary
- Questions & Exercises
- References
- 5 The Project Budget & Cost Control system
- 5.1 The Problem Wotj Construction Project Cost
- 5.2 Not All Estimates Are Equal
- 5.3 The Hierarchy of Project Estimates
- 5.4 Project Defintion to Cost Estimate Researcj Center Example
- 5.5 Functional Cost/Construction Cost/Corporate Cost
- 5.6 From Approved Budge
- 5.7 From Cost Control to Expenditure Control Reporting
- 5.8 The Database Drives Project Cost and Expenditure Control
- 5.9 Rationalizing Project Cost Control with PDS/WBS/OBS
- 5.10 Construction Project Cost Data Bases and Standards
- 5.11 S Curves, Earned Value and Performance Measurement
- 5.12 Summary
- Questions & Exercises on Cost Control
- References
- 6 The Project Planning & Schedule Control System
- 6.1 Introduction to CPM & PERT
- 6.2 Rules and Terminology for CPM/PERT Networks
- 6.3 Scheduling by CPM in Construction
- 6.4 CPM vs. PERT Networks for Scheduling Construction
- 6.5 The Politics of CPM & PERT Scheduling in Construction
- 6.6 State of the Art of CPM Network Scheduling
- 6.7 The Age of Computer Aided CPM/PERT Scheduling
- 6.8 CPM/PERT Scheduling Networks Based on the SPM Rule
- 6.9 Network Example Airport Project Passenger Terminal
- 6.10 Summary
- Questions & Exercises
- References
- Part Three -- Case Histories and Exercises
- 7 Corporate Engineering Department Case History
- 7.1 Introduction
- 7.2 The Foundation of the Project Control System
- 7.3 Introductory and Input Sessions
- 7.4 Summary of Input
- 7.5 System Development Graphics
- 7.6 Development Tasks
- 7.7 Project Control System Schedule of Tasks
- 7.8 Engineering Cost Control System
- 7.9 Project Expenditure and Cost Control System
- 7.10 System Based Cost Estimating
- 7.11 Summary
- Questions & Exercises
- References
- 8 Rapid Transit Expansion Program (RTEP) Case Exercise
- 8.1 Introduction to the RTEP Exercise
- 8.2 Project Defintion
- 8.3 Work Breakdown
- 8.4 Functional Organization
- 8.5 Code Category Development
- 8.6 Cost Control
- 8.7 Schedule Control
- 8.8 Cost and Schedule Integration
- 8.9 Summary
- Questions & Exercises
- References
- 9 Research Center Case History
- 9.1 Introduction
- 9.2 Stage 1 Concept Design & Cost Estimates
- 9.3 Stage 2 Capital/Lease Appropriation Request (C/LAR)
- 9.4 Stage 3 Design, Drawings, Specifications & Contract Docs.
- 9.5 Stage 4 Capital/Lease Appropriation Request (C/LAR)
- 9.6 Stage 5 Procurement
- 9.7 Stage 6 Construction
- 9.8 Stage 7 Installation
- 9.9 Stage 8 Commissioning and Startup
- 9.10 Stage 9 Operation
- 9.11 Summary
- Question & Exercises
- 10 High Speed Rail (HSR) Project Case Exercise
- 10.1 Introductin Case
- 10.2 HSR Project Defintion
- 10.3 HSR Project Work Breakdown
- 10.4 HSR Functional Project Organzation
- 10.5 HSR Project Cost Control
- 10.6 Computer Aided Systems
- 10.7 Cost Estimating and Cost Control
- 10.8 Scheduling ant to Project Cost Control Reporting
- 10.9 Summary
- Questions & Exercises
- References
- 11 International Airport Project Case Exercise
- 11.1 Introduction
- 11.2 International Airport Project Defintion
- 11.3 Intreantional Airport Work Breakdown
- 11.4 International Airport Organization
- 11.5 International Airport Project Cost
- 11.6 International Airport Project Schedule
- 11.7 Summary
- Questions & Exercises
- References
- 12 Research Center CPM Schedule Exercise
- 12.1 Introduction
- 12.2 Using the WBS to Creat CPM Activities
- 12.3 The CPM Network Schedule
- 12.4 Summary
- Questions & Exercises
- References
- 13 Construction Cost/Schedule Integration
- 13.1 Introduction
- 13.2 Construction Progress Bills
- 13.3 CPM Construction Network
- 13.4 Computer Processing
- 13.5 Communicating the Schedule
- 13.6 Summary
- Questions & Exercises
- References
- Part Four -- Project Managemetn Support Systems
- 14 Procurement and Purchasing
- 14.1 Introduction
- 14.2 Procurement as Project Stages
- 14.3 Construction Contracts as Procurement Methods
- 14.4 Purchase Orders as Sources of Cost
- 14.5 Summary
- Questions & Exercises
- References
- 15 Material Management
- 15.1 Materials Management
- 15.2 The Origins of Materials
- 15.3 Project Materials Control System
- 15.4 Summary
- Questions & Exercises
- References
- Answers To Selected Questions & Exercises
L'auteur - George Suhanic
Civil Engineer and President, Suhanic Project Management
Company.
Caractéristiques techniques
PAPIER | |
Éditeur(s) | Oxford University Press |
Auteur(s) | George Suhanic |
Parution | 01/09/2000 |
Nb. de pages | 472 |
Format | 19,5 x 24,3 |
Couverture | Relié |
Poids | 1026g |
Intérieur | Noir et Blanc |
EAN13 | 9780195115918 |
Avantages Eyrolles.com
Consultez aussi
- Les meilleures ventes en Graphisme & Photo
- Les meilleures ventes en Informatique
- Les meilleures ventes en Construction
- Les meilleures ventes en Entreprise & Droit
- Les meilleures ventes en Sciences
- Les meilleures ventes en Littérature
- Les meilleures ventes en Arts & Loisirs
- Les meilleures ventes en Vie pratique
- Les meilleures ventes en Voyage et Tourisme
- Les meilleures ventes en BD et Jeunesse