
Computer Integrated Construction Project Scheduling
Résumé
For a one-semester undergraduate lecture and lab Scheduling course in Construction Management departments.
Written in a style that is meant to be open and inviting to the reader with shorter paragraphs and interesting illustrations, this text provides a complete curriculum for a scheduling course, including a full discussion of planning and scheduling topics, thorough coverage of manual network diagramming and CPM calculations, and an extensive, module driven coverage of the most recent version of the SureTrak scheduling software. Additionally, it has built into it a "capstone" project which is a unique feature never seen in any other text. The book includes an abundance of "real world" examples of numerous scheduling exercises-including 17 pages of full-size drawings and schedules that are part of the exercises. Additionally, the information is presented modularly in such a way that it can be customized to fit any existing course.
Sommaire
- The Construction Industry
- Who's Who?
- What is a Project?
- Planning and Scheduling
- Activities, Logic, and Duration
- Network Diagrams
- CPM Calculations
- Creating Construction Schedules
- Modules
- Drawing the Schedule By Hand
- Creating a Project
- Adding Activities
- Adding Logic (Successors)
- Printing the Schedule
- Schedule Analysis: Modules 1-5
- Saving and Closing a Project
- Opening a Project
- Delhi Medical Building Project
- The PERT View
- Schedule Analysis: Modules 8-9
- Layouts - Saving, Applying, and Creating
- Formatting Columns
- Sorting by Early Start
- Formatting the Footer
- Formatting the Header
- Schedule Analysis: Modules 10-14
- Renaming a Project
- Working with Calendars
- Schedule Analysis: Module 16
- Activity Codes
- Budgeted Costs
- Resources
- Resource Profiles
- Resource Tables
- Schedule Analysis: Modules 17-21
- Target Schedules
- Reports
- Schedule Analysis: Modules 22-23
- Multi-Phase Projects
- Schedule Analysis: Module 24
- Updating the Schedule
- Schedule Analysis: Module 25
- Revising Schedules
- Capstone Project
Caractéristiques techniques
PAPIER | |
Éditeur(s) | Pearson, Prentice Hall |
Auteur(s) | John Buttelwerth |
Parution | 14/12/2004 |
Nb. de pages | 350 |
Format | 20,5 x 27,5 |
Couverture | Broché |
Poids | 1715g |
Intérieur | Noir et Blanc |
EAN13 | 9780131114654 |
ISBN13 | 978-0-13-111465-4 |
Avantages Eyrolles.com
Nos clients ont également acheté
Consultez aussi
- Les meilleures ventes en Graphisme & Photo
- Les meilleures ventes en Informatique
- Les meilleures ventes en Construction
- Les meilleures ventes en Entreprise & Droit
- Les meilleures ventes en Sciences
- Les meilleures ventes en Littérature
- Les meilleures ventes en Arts & Loisirs
- Les meilleures ventes en Vie pratique
- Les meilleures ventes en Voyage et Tourisme
- Les meilleures ventes en BD et Jeunesse