Tous nos rayons

Déjà client ? Identifiez-vous

Mot de passe oublié ?

Nouveau client ?

CRÉER VOTRE COMPTE
Computer Integrated Construction Project Scheduling
Ajouter à une liste

Librairie Eyrolles - Paris 5e
Indisponible

Computer Integrated Construction Project Scheduling

Computer Integrated Construction Project Scheduling

John Buttelwerth

350 pages, parution le 14/12/2004

Résumé

For a one-semester undergraduate lecture and lab Scheduling course in Construction Management departments.

Written in a style that is meant to be open and inviting to the reader with shorter paragraphs and interesting illustrations, this text provides a complete curriculum for a scheduling course, including a full discussion of planning and scheduling topics, thorough coverage of manual network diagramming and CPM calculations, and an extensive, module driven coverage of the most recent version of the SureTrak scheduling software. Additionally, it has built into it a "capstone" project which is a unique feature never seen in any other text. The book includes an abundance of "real world" examples of numerous scheduling exercises-including 17 pages of full-size drawings and schedules that are part of the exercises. Additionally, the information is presented modularly in such a way that it can be customized to fit any existing course.

Sommaire

  • The Construction Industry
  • Who's Who?
  • What is a Project?
  • Planning and Scheduling
  • Activities, Logic, and Duration
  • Network Diagrams
  • CPM Calculations
  • Creating Construction Schedules
  • Modules
    • Drawing the Schedule By Hand
    • Creating a Project
    • Adding Activities
    • Adding Logic (Successors)
    • Printing the Schedule
    • Schedule Analysis: Modules 1-5
    • Saving and Closing a Project
    • Opening a Project
    • Delhi Medical Building Project
    • The PERT View
    • Schedule Analysis: Modules 8-9
    • Layouts - Saving, Applying, and Creating
    • Formatting Columns
    • Sorting by Early Start
    • Formatting the Footer
    • Formatting the Header
    • Schedule Analysis: Modules 10-14
    • Renaming a Project
    • Working with Calendars
    • Schedule Analysis: Module 16
    • Activity Codes
    • Budgeted Costs
    • Resources
    • Resource Profiles
    • Resource Tables
    • Schedule Analysis: Modules 17-21
    • Target Schedules
    • Reports
    • Schedule Analysis: Modules 22-23
    • Multi-Phase Projects
    • Schedule Analysis: Module 24
    • Updating the Schedule
    • Schedule Analysis: Module 25
    • Revising Schedules
    • Capstone Project
Voir tout
Replier

Caractéristiques techniques

  PAPIER
Éditeur(s) Pearson, Prentice Hall
Auteur(s) John Buttelwerth
Parution 14/12/2004
Nb. de pages 350
Format 20,5 x 27,5
Couverture Broché
Poids 1715g
Intérieur Noir et Blanc
EAN13 9780131114654
ISBN13 978-0-13-111465-4

Avantages Eyrolles.com

Livraison à partir de 0,01 en France métropolitaine
Paiement en ligne SÉCURISÉ
Livraison dans le monde
Retour sous 15 jours
+ d'un million et demi de livres disponibles
satisfait ou remboursé
Satisfait ou remboursé
Paiement sécurisé
modes de paiement
Paiement à l'expédition
partout dans le monde
Livraison partout dans le monde
Service clients sav@commande.eyrolles.com
librairie française
Librairie française depuis 1925
Recevez nos newsletters
Vous serez régulièrement informé(e) de toutes nos actualités.
Inscription