
Résumé
This text thoroughly covers the topic of the need and use of project planning and scheduling in the construction industry. It approaches the subject-and its related terminology and techniques-from a conceptual viewpoint that reinforces students' learning with increasingly difficult levels of analytical problems. The book includes development of work breakdown structures, precedence grids, precedence network node diagrams, analytical methods for network solutions, resource scheduling, leveling and allocation, time-cost tradeoffs, and project-scheduling simulation with PERT application.
Sommaire
- Project Management in the Construction Industry.
- Construction Project Management Organization.
- The Network Plan.
- Scheduling Logic and Computations.
- Precedence Networking.
- Resource Scheduling, Leveling, and Allocation.
- Project Time Reduction/Time-Cost Tradeoffs.
- Project Scheduling with Uncertain Durations.
Caractéristiques techniques
PAPIER | |
Éditeur(s) | Pearson |
Auteur(s) | Charles Patrick |
Parution | 02/09/2003 |
Nb. de pages | 224 |
Format | 19,5 x 24,5 |
Couverture | Relié |
Poids | 545g |
Intérieur | Noir et Blanc |
EAN13 | 9780130924803 |
ISBN13 | 978-0-13-092480-3 |
Avantages Eyrolles.com
Nos clients ont également acheté
Consultez aussi
- Les meilleures ventes en Graphisme & Photo
- Les meilleures ventes en Informatique
- Les meilleures ventes en Construction
- Les meilleures ventes en Entreprise & Droit
- Les meilleures ventes en Sciences
- Les meilleures ventes en Littérature
- Les meilleures ventes en Arts & Loisirs
- Les meilleures ventes en Vie pratique
- Les meilleures ventes en Voyage et Tourisme
- Les meilleures ventes en BD et Jeunesse